Permanent Water Leakage Injection for Lift Pits, Basements, Joints & Concrete Cracks – Works Under Live Hydrostatic Pressure
The Live Leakage Injection Waterproofing System is a specialized solution for stopping active water leaks in concrete structures. Using polyurethane (PU) or acrylic-based resins, this system injects chemical grouts directly into cracks, joints, or honeycombs while water is actively flowing.
Known as “live injection waterproofing”, it provides a rapid, durable, and flexible solution without waiting for surfaces to dry or removing finishes.
Projects Completed

OFIXO's water leakage injection system is the most reliable solution for stopping active water leaks in lift pits, basements, parking decks, expansion joints, and concrete slabs across Dubai. Using high-pressure polyurethane (PU) injection, this system penetrates hairline cracks and voids to form an instant, flexible watertight seal - even under live hydrostatic pressure.
Injection of reactive resin (PU or acrylic) into cracks, joints, or voids
Allows slight structural movement without reopening the crack
Forms a watertight, elastic plug that seals cracks completely
Chemical reaction with water causes the resin to foam, expand, or gel
Seamless, internal waterproofing without damaging finishes
Basement walls and foundations
Underground tunnels and parking decks
Water tanks and swimming pools
Retaining walls and podium slabs
Expansion and construction joints
Lift pits, sumps, and concrete roofs


Verify correct injection pressure and resin volume
Observe resin flow at adjacent ports for full penetration
Conduct water-tightness tests after curing
Document resin usage and injection points for quality assurance
When water leakage injection is done right, it delivers permanent results – no excavation, no structural damage, no waiting for the leak to worsen.
OFIXO is Dubai’s trusted specialist for water leakage injection across basements, lift pits, parking structures, expansion joints, and concrete foundations. Our high-pressure polyurethane injection system stops active leaks instantly – working under live hydrostatic pressure to create a permanent, flexible seal from the inside out.
Whether you need emergency lift pit waterproofing or scheduled injection maintenance for a commercial property, OFIXO’s certified teams are ready to respond across Dubai and the UAE.
When applied by trained professionals with proper equipment, this system ensures durable, maintenance-free, and flexible waterproofing, even under continuous hydrostatic pressure.

Protect your concrete structures, basements, and tanks from water damage.
Call now or request a free consultation for expert live leakage injection waterproofing in Dubai.
Office B-71 Building El Shaye-4 Port Saeed, Dubai
[email protected]
London Office Address
85 GREAT PORTLAND STREET LONDON
ENGLAND W1W 7LT
[email protected]
If you notice standing water at the base of the lift shaft, active seepage through construction joints, efflorescence (white salt deposits) on walls, or a musty smell inside the pit, water leakage injection is likely required. Early injection treatment prevents damage to lift machinery, electrical systems, and the structural slab. Contact OFIXO for a free on-site inspection across Dubai.
Unlike traditional methods that require the surface to be dry or the removal of finishes, live injection works immediately while water is actively leaking.
The system primarily uses highly reactive Polyurethane (PU) foam or Acrylic-based resins.
Yes, the system is designed to provide a durable and permanent, and flexible barrier.
Typical applications include basement walls and foundations, underground tunnels, parking decks, water tanks, and more.
The reaction and expansion time is very rapid, typically ranging from 30 seconds to 5 minutes, providing immediate sealing of the crack.
An injection packer provides a secure, high-pressure connection point for the injection pump to deliver the resin into the structure.
No, a major advantage of this system is that it involves minimal structural damage.
After the initial reaction, the packers are typically removed after 2-4 hours of curing.
Yes, one of the primary advantages is its ability to work effectively under high hydrostatic pressure.
Protect your property with OfixoTech’s expert solutions that are durable, reliable, and tailored to every residential and commercial need.
Powered By: ESEO | Copyright by Ofixo Tech 2025 | All rights reserved.